skip to main | skip to sidebar

Dave Pray's BLOG

Dave Pray's musings relative to owner's representation, litigation support, and all the other things grabbing my attention that I feel worthy of sharing.

Monday, September 8, 2008

Second Floor Carpet Being Installed

The second floor carpet install began today. The second floor carpet will be complete by the end of the day Tuesday.

Posted by Dave Pray at 11:19 AM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Dave Pray

Dave Pray
PrayWorks manager

Subscribe via E-Mail

Enter your Email


Preview | Powered by FeedBlitz

About Me

My photo
Dave Pray
View my complete profile

Blog Archive

  • ►  2012 (1)
    • ►  September (1)
  • ►  2011 (3)
    • ►  November (2)
    • ►  January (1)
  • ►  2010 (8)
    • ►  December (1)
    • ►  May (1)
    • ►  April (1)
    • ►  March (2)
    • ►  February (3)
  • ►  2009 (35)
    • ►  December (4)
    • ►  October (4)
    • ►  September (2)
    • ►  August (3)
    • ►  July (2)
    • ►  June (1)
    • ►  May (2)
    • ►  April (6)
    • ►  March (1)
    • ►  February (3)
    • ►  January (7)
  • ▼  2008 (87)
    • ►  December (2)
    • ►  November (3)
    • ►  October (4)
    • ▼  September (12)
      • Front Entry Door in Progress
      • Signage at Capitol Street Elevation
      • The Basement...I mean Lower Level
      • Furniture Hits the Streets
      • Bringing 'Er In
      • Lounge--Before
      • Front of the House
      • Lower Level (aka basement) take shape
      • Second Floor Carpet Being Installed
      • Lobby Emerges
      • Second Floor Taking Shape
      • Acoustic Control
    • ►  August (4)
    • ►  July (13)
    • ►  June (11)
    • ►  May (12)
    • ►  April (6)
    • ►  March (11)
    • ►  February (9)