Wednesday, May 27, 2009

Details...Details..Details

Man.......I've forgotten the difference between residential work and commercial. If you're talking about about any type of high end work (and this does not necessarily mean expensive material but it likely does), there are TONS of details to attend to. Now...there's the mundane stuff which is simply about expediting.....as in material. We've been short on beaded ceiling and then the yellow pine flooring was late in arriving. We had a few lights that came from New Zealand....then there is the engineered pine flooring....and the pine flooring adhesive....the concrete stain...paint...and more paint...doors...hardware....speaker wire....recycled material....layout...layout...layout....tile work...refinished mantle....and then there is T2 (OK...you had to be there)....concrete...gravel...clean the stone.....this is all a partial list....I'm not kidding.

Anyhow...it's getting done and the RC team has done a great job. It's so helpful that they do so much work with their own forces. We'll be substantially complete in about a week.

Hard to find the time to BLOG with all this going on.

thanks

DP

1 comment:

Anonymous said...

how about that new baby?? Mary C.