I can always tell when a job is coming to the end because I feel like I need a body guard to accompany me on the job tour. Managed creative conflict.
In one week, the overlay of the existing floor (Dura-Cap) will take place...so the Pray team has been pushing the gypsum installation (which wants to be completed before dura-cap) and they have gotten permanent power in place in order to operate the air conditioning on a temporary basis for humidification control.
To top things off, the basement is experiencing some leaks, so now that source needs to be discovered and corrected.
The September 19th date stands per Pray Construction management.