Friday, August 29, 2008

Bring on the Carpet



OK...it might appear to be a bit early for carpet. The date of substantial completion is yet three weeks away, so there is a lot of work to perform before the carpet is installed...right? Well, that is correct. One of those tasks is to install the last window on the second floor, so to facilitate the installation of carpet beginning the week after next, it's appropriate to get the goods at least in the building in the simplest fashion possible. That's what's going on in this photo.
Material handling on some projects can be much more troublesome. I recall building a restaurant in Jersey City in a regional shopping center. We had to take delivery of some paneling for the facility and, to do so, we were obliged to schedule our time at the loading dock which was restricted to one hour per day. So, the panelling shows up at the appropriate time and the superintendent goes down to unload it from the truck. The teamster (this was a hard line union project), looks at the superintendent when he arrives and the back door is still closed on his truck. He says he'll be leaving in 30 minutes. "Well....how do I get this truck door open?". Answer..."$100 will do the job."
Ahhhh...life in the northeast.

Tuesday, August 26, 2008

This should be a Weekend Post

OK.....in response to my friend Karen Farmer (far right), I take the liberty of adding this photo to BLOG.

I'm surrounded by attorneys (Farmer/Long) which is dangerous I know, but the more I know about lawyers, the more likely I am to help make their facility great. Anyhow...that's my story and I'm sticking to it.

Monday, August 18, 2008

DuraCap Poured


Beginning with preparation on Thursday and then pouring proceeding on Friday and Saturday, the DuraCap installation began and was completed. I'd say this was the most dramatic visual improvement to the building yet.
This work was done on Pray's schedule, so we are still looking at September 19th as the day the project will be substantially complete.

Friday, August 8, 2008

It's Crunch Time!!

I can always tell when a job is coming to the end because I feel like I need a body guard to accompany me on the job tour. Managed creative conflict.

In one week, the overlay of the existing floor (Dura-Cap) will take place...so the Pray team has been pushing the gypsum installation (which wants to be completed before dura-cap) and they have gotten permanent power in place in order to operate the air conditioning on a temporary basis for humidification control.

To top things off, the basement is experiencing some leaks, so now that source needs to be discovered and corrected.

The September 19th date stands per Pray Construction management.

Sunday, July 27, 2008

Pat Brown Takes a Tour


Pat Brown is the executive director of CURA and I recently extended Pat an invitation to take a tour. As Pat mentioned, its great that the building is being renovated, but notably it is great that the building will be the downtown day-time home to so many people which is just good for the downtown environment.

209 Capitol was purchased from the trust department of a bank by CURA essentially to keep the building from becoming a surface parking lot. Good move.

Isn't Construction Work Easy??


Construction is still a world that is full of some tough manual labor. Pictured above is superintendent Bob Settle's (at the left) "A Team". Bob is a lead by example kind of fellow, and here is the team taking a pause for a photo opportunity after completing the task of manually filling the stair pans with concrete.
Tough work.....and thankfully now complete for both stairs.
Great job team!

Tuesday, July 22, 2008

The 3 P's

Laura and I were had the pleasure of dining with some friends this weekend whose family has been in the automobile business in Charleston and Huntington for many years. When the patriarch was bringing the next generation along many years ago, he mentioned to be wary of the 3 P's regarding credit.....Politicians....Police...Preachers. However, there was one P that could always find the cash...the Prostitutes!

I thought that was worth sharing.

Completion Date September 19

Pray Construction has recently committed to a completion date of Friday, September 19. Over the years, Pray has developed a reputation for on-time delivery, so I do trust they will make it happen.

Stay tuned and find out how it goes.

Saturday, July 19, 2008

Tour Sprinters and Breakaway Riders

I hope you've been making some time to see the tour this year. We're clearly seeing Mark Cavendish establish himself as one of the sport's all time great sprinters. 4 stages wins!

The local newspapers now report Will's place in the gc (general classification) standings, which to a degree misses the point. But I get it...the sport really is too tough to understand unless you grew up around it (as many Euros do) and/or raced at some level yourself as I did,

Assuming you don't fit either categories, and perhaps want to figure the sport out a bit, here is an interesting link from Saris that might be worth a read. (Topic is Tour Sprinters and Breakaway Riders).

Thursday, July 17, 2008

Mark Grigsby's Involvement in 209

I’ve been involved in this industry for over 30 years now and have interfaced with a lot of owners as a contractor/design-builder; I’ve represented a lot of owners and been an owner myself. Clearly, one of the dirty words from an owner’s point of view is the two words “change order”.

That’s understandable. I’ve seen very few owners that have an open check book. Money is always an issue. The goal of course is to go through the design/construction process and stay within the boundaries of tolerance for the deal. And, it is only good business that all parties in a transaction are rewarded fairly.

Most of the aspects of this project were relatively simple to project. However, one area that was quite difficult was the process and associated compensation for the demolition scope of work. So, we elected to perform this scope of work on a cost of the work basis. In effect, Pray Construction Company would not be at risk for the unknown, have no opportunity to disproportionately enrich themselves, and the owner assumes more risk.

Along the way, we discovered several structural defects with the building’s flooring system that required extensive repairs. Similarly this work moved forward on a cost of the work basis, plus a markup for the work. This put some pressure on the deal and made the administration of the contract (particularly from a financial point of view), heightened.

As clear as this all sounds now as I write them, there were different points of view of what the contract said and how it was or should be administered.

So…how to resolve this dispute? This is when character makes a difference and one of the great things for me is observing the leadership and character Mark Grigsby (Pray’s president and my successor) brings to the table. Mark steps up, gets involved, and helps craft a resolution to a brewing dispute that is fair for all.

I’ve told Mark this privately and now say it publicly; Pray Construction has a great leader with Mark Grigsby.

Sunday, July 13, 2008

Blogosphere...Trolling for work

I recall when I was growing up, there was no advertising by most professionals. I really don't have a comment about that one way or the other frankly. Seems like if you need an attorney, as an example, one ought to be able to look around as one would for any other type of service provider.

http://www.northcarolinainjurylawyerblog.com/

Checkout the above link. Put aside your thoughts and feelings about the plaintiff's bar for a moment, and review how effective this BLOG is. This is an effective way of checking out a firms expertise if you are in need of service.

Real Estate BLOG that may be of interest

http://www.realblogging.com/

Friday, July 11, 2008

iPhone arrives...camping out....other stuff


So, this week, in addition to my normal duties on 209 (getting furniture moving, negotiating details of various change orders, dealing with issues involved with this week's downpour), I have been swamped with Soaring Eagle Lodge.
So...I get to drive back and forth to Snowshoe on Tuesday and, as I'm carting all my stuff into my home around midnight, I inadvertently leave my cell phone on the roof of my car. Well, it pours all night and Razrs don't do well in water. Alright...fine. I've been eyeing the new iPhone anyway. So, I go to AT&T and visit with a sales rep. She brings up my record and tells me I can come up Friday and get a new one.
Fine.
So, I'm up at Southridge at 6:30 am camping out! Clearly the oldest guy on line. Around 8:15 I make it in...pickout my accessories...but wait....you're a CORPORATE CLIENT.....we can't do this for you.
Hmmmm...thought this new phone was aimed at the business market.
But I was cool and I choose not to come back and open fire. Instead, my dear wife Laura spent 2.5 hours and got the deal done.
So....the photos are a shot at the line and the man is the fellow that showed up at 4:00 am.
Thought my readers would like to see him.

Monday, July 7, 2008

Will Frischkorn Second in stage, Third overall!!!!!!!!!!!

http://cyclingnews.com/

Cycling News will have tons of information. What a ride! Wow!!!!

General classification after stage 3

1 Romain Feillu (Fra) Agritubel
2 Paolo Longo Borghini (Ita) Barloworld 0.35
3 William Frischkorn (USA) Garmin Chipotle - H30 1.42
4 Alejandro Valverde (Spa) Caisse d'Epargne 1.45
5 Kim Kirchen (Lux) Columbia 1.46
6 Oscar Freire (Spa) Rabobank
7 Jérôme Pineau (Fra) Bouygues Telecom
8 David Millar (GBr) Garmin Chipotle - H30
9 Cadel Evans (Aus) Silence-Lotto
10 Filippo Pozzato (Ita) Liquigas

See attached video.

Saturday, July 5, 2008

New Fire Service Line

Sometime in the recent past, the City of Charleston replaced the main fire service line located under Capitol Street. When the new line was installed, they also provided lateral taps to the building. So, what's going on here is the installation of a new line (exclusively for fire service) from the building to the saddle on the new fire service line. The reason this work is being performed is because the existing lateral will one day deteriorate and leak/break and then the repair takes place on the pipe's schedule, not ours.

Thursday, July 3, 2008

Open Cell Spray Foam Insulation


The above photographs illustrate an open cell spray insulation known as Icynene. Icynene is a more expensive choice when compared to traditional fiberglass insulation, but in this building, it will provide a much more complete envelope and substantially reduce infiltration.
We theorize the savings in fuel costs will pay for the additional cost. Certainly, Icynene is high on the list of green products.

Monday, June 30, 2008

Have you tried No Assital??

No Assital is a great over the counter drug used by construction superintendents across America to ward off the potential impact from ass chewing a super can receive from a project or development manager.

Bob Settle, our very diligent superintendent, swears by the stuff and believes he has needed a ton of it to get thru this project.

I told him I'd share this hint with our readers.

Thursday, June 26, 2008

Indoor Air Quality

I was reminded today about how much our industry has changed over the past few years. Why you might ask?

As an example, today I stimulated and participated in a conference with the project’s environmental engineer (Chris Belcher with Pinnacle Environmental) . Now, I’m pretty sure 20 years ago environmental engineers worked in industrial engagements. I’m all but sure the concept of having a team member lead a thoughtful discussion about how to create an appropriate inside air environment would have never been an agenda item.

Today, we talked about dust control, protecting material (like duct work) from being contaminated during construction with dust or (heaven forbid) creating an environment for mold to prosper, relative humidity inside the building during construction and methods to manage, techniques for monitoring the same, how to protect gypsum board from creating a home for mold growth, appropriate carpet adhesives and so forth.

I’m sure we all end up with better buildings and this of course is a good thing. But the development teams of the past are a far cry from what the market wants/needs today.

Wednesday, June 25, 2008

Will Frischkorn goes to Le' Tour!!

Yesterday, Slipstream Sports ( rather Garmin-Chipotle) announced its Tour de France Team and it includes my friend and former West Virginian Will Frischkorn.

As the press release notes, Will is one of four Americans riding in Le Tour this year. I imagine this is the first West Virginian ever to ride in what is arguably the toughest endurance sporting event in the world.

I know Will reads this BLOG....from all your WV buddies Will....go get em'! What an honor.

Also, here is Will's BLOG. As noted, he'll be writing a daily journal for Velo News.

Also, see my March 22nd post.